ShadyBanks.org

Photo Gallery
Sewer Hookup
Click on thumbnails to see larger views

Our neighbor Bolie Soloven provided these pictures of his sewer hookup project. The pictures are in chronological order and will give you an idea of how the process works. 

before the dig.NEF04.jpg (178297 bytes) found the cover.NEF13.jpg (211759 bytes) open septic4.NEF15.jpg (225206 bytes)
Front yard before excavation Digging for the septic tank Opening the tank
trench around septic3.NEF19.jpg (211535 bytes) cut septic feeder2.NEF09.jpg (181404 bytes) build new sewer line4.NEF05.jpg (175459 bytes)
Digging trench around
septic tank
Cutting feeder line from
house to tank
Cleanout pipe at house
end of new line
city lateral.NEF.jpg (164040 bytes) add some more pipe.NEF01.jpg (191935 bytes) cleanout at lateral.NEF07.jpg (170046 bytes)
Street end of trench -
note lateral connector
Installing the pipes Another cleanout at
lateral end of pipe
new line is in3.NEF14.jpg (190141 bytes) pump out septic2.NEF17.jpg (186572 bytes) decommision septic7.NEF10.jpg (183976 bytes)
Pipes are all installed Pumping out the
septic tank
Decommissioning
the tank
fill with water for inspector2.NEF11.jpg (164014 bytes) backfill.NEF03.jpg (213009 bytes) backfill septic3.NEF02.jpg (209131 bytes)
Ends of pipe are plugged
and a leak test performed
After inspection, the
trench is backfilled
The tank is filled
with sand
compact backfill2.NEF08.jpg (207775 bytes) replace grass8.NEF18.jpg (187911 bytes) finished job3.NEF12.jpg (205213 bytes)
The fill is compacted Sod and mulch are replaced And the job is done !

 

To go to other pages on this site, use the Site Navigator (at left)
or click here to go to our Home Page.

Copyright © 2007
Shady Banks Civic Association